17
20
4
assemly-line-1
embedded
previous arrowprevious arrow
next arrownext arrow
Rack Twist Testing System:-

In this testing system, the test is performed on test component in seven step sequence. The major criterion of this testing system is to twist the component and check the performance during and after twisting. Our task is to modify the Electrical Circuit and to improve the repeatability of the
Test Results (especially in LVDT ±30µm) in the system which was not satisfactory earlier.

To achieve the desired performance, we replaced the LVDT with FS ±1mm & with Wago Isolator of 0-10 VDC, the rerouting in wiring, adding Noise Filter and Fixture alignment resolve the problem and achieve the repeatability of LVDT with in ±18µm. Similarly we executes the similar projects successfully as per the Design Drawing Schematic from our Customers.


OUR CLIENTS

IFB TALBROS JCB JTEKT RICO CONTINENTAL IFB TALBROS JCB JTEKT RICO CONTINENTAL IFB TALBROS JCB JTEKT RICO CONTINENTAL IFB TALBROS JCB JTEKT RICO CONTINENTAL
If you need any industrial solution, please contact with us

about us

COLD FUSION CONTROL SYSTEMS established in 2013 is an SPM’s & Automation Solutions provider, based in Gurgaon. We are primarily dealing in PLC / PC / Data Acquisition (DAQ) types of control panel systems, integration and automation (POKA-YOKE), SCADA, LABVIEW / MATLAB Programming, Industrial Software’s, ANDON Systems (PC Based) / SPM’s.

Contact Info

KHASRA NO.-1479, 8 BISWA,OPP. SAINI CHOPAL, GURGAON VILLAGE, GURUGRAM, HARYANA 122001